Description:
Eurotunnel Pack incorporates the next tunnels:
-> strengthened arch with completely different widths: 8,50 meters, 9,30 meters, 10,40 meters and 12,00 meters.
-> single arch with completely different widths: 6,50 meters, 8,50 meters, 9,30 meters, 10,40 meters and 12,00 meters.
-> double straight leg arch with completely different widths: 34,00 meters, 36,00 meters and 38,00 meters.
-> straight leg "L" arch with completely different widths: 10,00 meters, 12,00 meters, 14,00 meters and 16,00 meters.
-> straight leg "M" arch with completely different widths: 17,00 meters, 18,00 meters and 19,00 meters.
For all tunnels you’ll be able to select completely different lengths: 4,80 meters, 9,60 meters, 14,40 meters and 19,20 meters.
!!Essential!!
Tunnel with computerized bale loading, please place solely on self-levelled terrain!
Changelog: 3.0.1.0
– added the opportunity of rotation through the buy for tunnel with computerized bale loading, solely 90 levels potential
Changelog: 3.0.0.0
– added tunnels with computerized bale loading
Changelog: 2.2.0.0
– Seasons-Prepared (added Seasons-Masks)
Changelog: 2.1.0.0
– mounted the physique collision and the sale motion
Changelog: 2.0.0.0
– added new fashions: strengthened arch, double straight leg arch, straight leg "L" arch and straight leg "M" arch
Credit:
DD ModPassion